Problem
#167508

The Seaboard Trucking Company has expanded its shipping capacity by purchasing 120 trucks and trailers from a competitor that went bankrupt.

These two problems should be done in excel, and must be done using the solver application, which would make it a lot simpler.  Need to provide the formulas.  

13-3
The Seaboard Trucking Company has expanded its shipping capacity by purchasing 120 trucks and trailers from a competitor that went bankrupt.  The company subsequently located 40 of the purchased trucks at each of its shipping warehouses in Charlotte, Memphis, and Louisville.  The company makes shipments from each of these warehouses to terminals in St. Louis, Atlanta and New York.  Each truck is capable of making one shipment per week.  The terminal managers have each indicated their capacity for extra shipments.  The manager at St. Louis can accommodate 40 additional per week, the manager at Atlanta can accommodate 60 additional trucks, and the manager at New York can accommodate 50 additional trucks.  The company makes the following profit per truckload shipment from each warehouse to each terminal.  The profits differ as a result of differences in products shipped, shipping costs, and transport rates.  

Warehouse St. Louis Atlanta New York
Charlotte $1,800 2100 1600
Memphis 1000 700 900
Louisville 1400 800 2200



The company wants to know how many trucks to assign to each route to maximize profit.  Formulate a linear programming model for this problem and solve it.  

13-6
A small metal-parts shop contains three machines- a drill press, a lathe, and a grinder- and has three operators, each certified to work on all three machines.  However, each operator performs better on some machines than on others.  The shop has contracted to do a big job that requires all three machines.  The times required by the various operators to perform the required operations on each machine are summarized as follows:
Operator Drill press Lathe Grinder
1 22 18 35
2 29 30 28
3 25 36 18
(time in minutes).  The shop manager wants to assign one operator to each machine so that the total operating time for all three operators is minimized.  Formulate and solve a linear programming model for this problem.  

Attached file(s):
Attachments
mgt 360.doc  View File

Attachment Content Summary (Note: view attachment at the above link before purchasing. Actual attachment content may vary slightly from that shown below.)

mgt 360.doc
13-3

The Seaboard Trucking Company has expanded its shipping capacity by
purchasing 120 trucks and trailers from a competitor that went bankrupt.
The company subsequently located 40 of the purchased trucks at each of
its shipping warehouses in Charlotte, Memphis, and Louisville. The
company makes shipments from each of these warehouses to terminals in
St. Louis, Atlanta and New York. Each truck is capable of making one
shipment per week. The terminal managers have each indicated their
capacity for extra shipments. The manager at St. Louis can accommodate
40 additional per week, the manager at Atlanta can accommodate 60
additional trucks, and the manager at New York can accommodate 50
additional trucks. The company makes the following profit per truckload
shipment from each warehouse to each terminal. The profits differ as a
result of differences in products shipped, shipping costs, and transport
rates.

Warehouse   St. Louis Atlanta New York

Charlotte   $1,800 2100 1600

Memphis   1000 700 900

Louisville   1400 800 2200















The company wants to know how many trucks to assign to each route to
maximize profit. Formulate a linear programming model for this problem
and solve it.

13-6

A small metal-parts shop contains three machines- a drill press, a
lathe, and a grinder- and has three operators, each certified to work on
all three machines. However, each operator performs better on some
machines than on others. The shop has contracted to do a big job that
requires all three machines. The times required by the various
operators to perform the required operations on each machine are
summarized as follows:

Operator Drill press Lathe Grinder

1 22 18 35

2 29 30 28

3 25 36 18

(time in minutes). The shop manager wants to assign one operator to
each machine so that the total operating time for all three operators is
minimized. Formulate and solve a linear programming model for this
problem.

Solution Summary

Excel file contains:
1. Formulation (decision variables, objective function, and constraints)
2. Model implementation in Excel using Solver tool

Solution
What is this?
By OTA - Overall OTA Rating
Purchase Cost Now
$2.19 CAD (was ~$23.94)
Included in Download
  • Plain text response
  • Attached file(s):
    • Seaboard trucking company and metal shop.xls
$2.19 Instant Download
Add to Cart
Why you can trust BrainMass.com
  • Your Information is Secure
  • Best Online Academic Help Service
  • Students find real academic Success
Related Solutions
  • Linear Programming - Milton Manufacturing Company - I need help formulating a linear programming model that can be used to determine the production plan that will yield the maximum possible annual profit contribution for the company. Milton Manufact ...
  • Linear Problems - Which relationships are linear? a) Quantity Profit 0 $0 1 $1,500 4 $6,000 9 $13,500 b) Quantity Metal Used 0 0 oz 1 8 oz 2 18 oz 3 26 oz c) Quantity Fi ...
  • Evolution of Programming Languages Microsoft PowerPoint Presentation - Detail the evolution of programming languages. I need to organize in the form of a timeline, and I need to discuss the various generations of programming languages (1st through 4th).
  • Linear Programming - Which relationships are linear? a) Quantity Profit 0 $0 1 $1,500 4 $6,000 9 $13,500 b) Quantity Metal Used 0 0 oz 1 8 oz 2 18 oz 3 26 oz c) Quantity Fi ...
  • Linear programming - Need help with the following using Excel,
Browse