The following question are already answered from a book perspective but I am looking for some profesional first hand knowledge into these topics. The answeres do not have to be very long what so ever. I am just looking to get some additional input.
(a) What should be management's role in the system development life cycle (SDLC)?
(b) Why does project planning usually come before analysis and design?
(c) What are some of the methodologies commonly used for requirements elicitation?
(d) How can a prototype be used?
(e) What are some metrics that can be used during the SDLC? List the various steps and applicable metrics.
(f) What are some reasons why systems fail?