a). Display this time series as a line graph (please use excel).
b). Find the 4-period MA (moving average) forecast for January 1997.
c). Find the MSE (mean square error) for the 4-period MA (mean average) model.
See attached file for full problem description.
This solution looks at the moving average and mean square error of a time series.