Purchase Solution

Oregon: Communications, Materials and inventory, Order entry, Supervision at the plants, General production flow

Not what you're looking for?

Ask Custom Question

What you expect to find when you arrived in Oregon. Here is some more information you have obtained from management:

Facilities P and T both claim that parts from the S facility sometimes do not arrive on time, causing costly production shut-downs which periodically lead to missed contractual ship dates.
The S facility has records that those same parts were loaded onto trailers and that the semi-trailers left on time.
Facility S habitually runs out of the "accessory" parts which are shipped from the T and P facilities.
There have been recent instances where over seven shifts of production from a single molding machine have been defective due to a malfunctioning mold.
Similar quality problems have occurred when the wrong plastic resins have been used for some molded parts.
Work-in-process (WIP) within the stamping department is sometimes misplaced or lost, disrupting downstream manufacturing processes and leading to missed shipments to the T and P facilities.
Upon arriving on site and interviewing the production and inventory planning staffs at all three facilities, you hear the following:

Facility S claims that there have been instances where they have been over one day ahead of their shipping schedule for specific parts, and that the T and P facilities were still claiming they were out of that part. Then, the "missing" parts were located in a still loaded semi-trailer in the yard adjacent to the P and T facilities.
The production and inventory planning staff at the T and P facilities claim to be shipping the "accessory" parts to the S facility on a JIT (Just in Time) basis and that their shipments should be adequate to support the S facility's requirements on a level production plan.
The small quality control group at the S facility point out that they do not have the equipment or training to perform quality checks to the same level that facilities P and T are able to perform.
Due to recent economic conditions, only a single supervisor is available in the stamping department and in the molding department during midnight shifts and on weekends.
Individual Portion:

Summarize findings and recommendations on the topics of:

Communications
Materials and inventory
Order entry
Supervision at the plants
General production flow

Summarize your findings and recommendations into a report, including a final summary at the end.

Group Portion:

Post your report to the Small Group Discussion Board. Review each members' report. Come to a group consensus on the findings and recommendations.

Summarize your individual findings and recommendations into a group report. This is your final summary discussing all of the elements from the individual portions. It should be a summary tying everything together with a group consensus.

Purchase this Solution

Solution Summary

Discussion is 1,797 words plus three references.

Purchase this Solution


Free BrainMass Quizzes
Balance Sheet

The Fundamental Classified Balance Sheet. What to know to make it easy.

Paradigms and Frameworks of Management Research

This quiz evaluates your understanding of the paradigm-based and epistimological frameworks of research. It is intended for advanced students.

Team Development Strategies

This quiz will assess your knowledge of team-building processes, learning styles, and leadership methods. Team development is essential to creating and maintaining high performing teams.

IPOs

This Quiz is compiled of questions that pertain to IPOs (Initial Public Offerings)

Employee Orientation

Test your knowledge of employee orientation with this fun and informative quiz. This quiz is meant for beginner and advanced students as well as professionals already working in the HR field.